Power Distribution
Critical Infrastructure

Eliminate Unplanned Outages. Protect Grid Revenue.

Grid downtime is costly for Qatar utilities. Our predictive connectivity platform provides early warning of equipment issues, helping you meet regulatory requirements and protect your bottom line.

99.9%
Uptime guarantee
$500K
Avg. daily savings
24/7
Real-time monitoring
The Challenge

Unplanned outages create significant costs for utility operations

Without predictive visibility, a single equipment failure cascades into regulatory penalties, revenue loss, and reputation damage across the entire grid.

Generation
Undetected SCADA vulnerabilities and transformer failures without warning
Transmission
Single-point connectivity failures and delayed fault isolation
Distribution
Limited visibility into equipment health and manual inspection backlogs
Consumer
AMI connectivity blind spots and revenue leakage from billing gaps
Average Impact Per Incident
$700K
in potential losses
$700K
Avg. outage cost
4.2 hrs
Mean repair time
23%
Revenue at risk
Regulatory penaltiesHigh Risk
Customer satisfaction impactModerate
Grid Operating Normally
Live Grid Monitor
GENERATIONTRANSMISSIONDISTRIBUTION
Affected Nodes
0
substations
Est. Impact
$ 0
per incident
Grid Status
Operational
Healthy
Warning
Failed
Recovering
The Solution

From reactive repairs to predictive protection

Watch how our platform detects and isolates failures before they cascade. Redundant connectivity eliminates single points of failure while real-time monitoring ensures regulatory compliance.

Early warning alerts
Predictive detection before cascade
Real-time monitoring
Millisecond precision tracking
Security-first design
Critical infrastructure protection
Edge processing
Rapid local decision-making
High availability
Measurable savings
Compliance ready
99.9%
Uptime target
60%
Faster response
24/7
Active monitoring
Enterprise Capabilities

Built for executive priorities

Every capability addresses board-level concerns: uptime protection, regulatory compliance, cybersecurity, and operational cost control.

Predictive Intelligence
AI-driven analytics detect equipment issues early
Remote Asset Control
Centralized dashboard for distributed assets
Executive Visibility
Real-time KPIs for board reporting
High-Availability
Automatic failover and redundancy
Security-First
Zero-trust architecture for critical infrastructure
Power Grid Control Center
Early
Warning Alerts
High
Availability
Secure
Architecture
Platform Active·Monitoring Enabled
Measurable
Business Impact
Outcomes designed for executive reporting
Enhanced
Security posture
Streamlined
Compliance process
Improved
Grid reliability
Faster
Issue resolution
Expected Outcomes

What grid operators can achieve

Our platform is designed to deliver tangible business outcomes that matter to utility executives and board members.

Reduced Operational Costs
Through predictive maintenance and fewer emergency repairs
Higher System Availability
With redundant connectivity and early warning alerts
Fewer Unplanned Outages
By identifying issues before they become failures
Security-first architecture
Audit-ready reporting
Board-level dashboards
PDM-1000 Power Distribution Module
PDM-1000
PD-Mesh Node
Enterprise+
Grade reliability
Industrial Grade·Qatar Optimized
Enterprise Hardware

Industrial-Grade Grid Infrastructure

Enterprise routers designed and tested for Qatar's extreme conditions. Built for longevity and reliable performance in critical infrastructure deployments.

Self-healing mesh
Eliminates single points of failure
Solar-powered option
For remote substations
IP67 rated
For Qatar's extreme temperatures
Fast failover
For high availability requirements

Why Qatar Utilities Choose IoT Shabaka

Fast
Deployment
Pre-configured for Qatar
Proven
Reliability
Industrial-grade hardware
Local
Support
Qatar-based team
Lower
Total Cost
Long lifespan design

Stop Paying for Outages. Start Preventing Them.

Get a complimentary grid vulnerability assessment. Our engineers will identify your highest-risk assets and calculate potential cost avoidance within 48 hours.

48-Hour Risk Assessment
Identify top 10 high-risk assets and calculate outage cost exposure
ROI Business Case
Board-ready cost avoidance projections with Kahramaa compliance roadmap
90-Day Pilot Program
Validate results on 50 critical assets before full deployment
Measurable
Return on Investment
Through reduced outages and operational efficiency
Fast
Payback potential
Local
Qatar-based support
High
Availability design
Pilot
Program available

Speak with a Grid Solutions Executive

Direct line to our Qatar-based technical leadership team